Reimagining everyday public infrastructure as small but meaningful places within the coastal landscape.
Overview
The Coastal Amenities project reimagines a series of public amenities as a family of small civic pavilions thoughtfully integrated into the coastal landscape. A shared architectural language creates a recognisable identity across the region, while each pavilion responds to its unique setting through materiality, orientation and landscape.
Designed for accessibility, durability and long-term public use, the pavilions combine robust coastal materials with passive ventilation, generous shade and carefully framed views. More than functional infrastructure, the project demonstrates how modest public buildings can enrich everyday experiences, strengthen connections to place and make a meaningful contribution to the public realm.
Client City of Moreton Bay
Location South East QLD
Date 2026
Status Concept Design
AOG Team Anna O’Gorman, Naomi Edson
Renders Kin Creative
The Brief
The brief was to take four ageing public amenities along a bay foreshore and replace them with buildings that are accessible, safe and vandal-resistant - and most importantly last 50 years in salt air, storm tide, and heavy use.
The Strategy
We saw a chance to do more than replace. Public amenities are some of the most-used buildings in a community, and they rarely get the care of a pavilion. So we designed four pavilions that belong to each other and to their places.
The starting point was a set of white timber follies along one of the sites’ boardwalks: light, precisely detailed structures that give more than the sum of their parts. We carried that language through all four sites, with expressed timber columns, trellises and roof beams over sandy blockwork and exposed aggregate slabs. Each building then takes its own colour from its setting, whether that’s the yellow of the beach, the terracotta of an old brick building, the deep green of mature pines or the pale turquoise of a nearby channel.
Breezeways, basins that look out to the water, skylights that let the roofs glow at night, and seating at varied heights make these places to pause, not just to pass through.
Built for the foreshore
Raising each building above the flood planning level would have meant over 21 metres of ramping on average at three of the four sites. That is costly, visually heavy and a poor outcome for access. Instead, we set floor levels to meet the existing paths and designed the buildings to be inundated and washed down, with robust finishes and critical services lifted clear. Three of the four sites use split layouts, which let floodwater move around the enclosed rooms.